FAQs

Q?

Do you provide any size mezzanine floor?

A.

Yes – our mezzanine floors are custom made so we can provide anything from a small floor to a large multi-tier floor.

Q?

Do you do supply only?

A.

We offer three services when you choose us for your mezzanine flooring: manufacture for ex works collection, delivery or full service manufacture, delivery and installation

Q?

Once I place an order for a mezzanine floor, how long will it take?

A.

Approximately 4 weeks from approval of drawing although this can depend on the size of the project and production/installation schedules.

Q?

Do I need to handle Building Regulations?

A.

No Bradfields can consult with the Building Inspector and handle the building regulations for you.

Q?

Can I change the design?

A.

You can normally change the design in the first two weeks but this may result in additional cost depending what stage of manufacture the floor is.

Q?

How can I be sure that health and safety measures are being followed?

A.

Site work and installation is carried out under CHAS and Safe Contractor health and safety accreditation schemes. See Design & Installation for more information.